[size=9.5pt]Th is paper mainly int roduces the combus
2
[size=9.5pt]t ion equipment status and it s operat ing perfo rmance of the first impo rted 300MW supercrit ical p ressure bo iler made by the fo rmer Soviet Russia. A brief analysis on it s design and operat ing characterist ics is made and the relevant conclusion and p rop sals are put fo rward as well.